| CHALLENGE, DESIGN & SUCCESS: Tackling
the hard jobs Our client had a primary crusher installation that
was in need of attention, and was difficult to operate and maintain.
Our job was to redesign the feed bin, design a new grizzly and chute
work to fit within the existing structure. The challenge was to
maximise plant availability, minimise maintenance costs and rework
the existing platforms for better operator access.
We designed all aspects of the project, and produced workshop fabrication
drawings, which enabled a successful upgrade.
Click
here to view example in PDF format. |